I have heard the same info as the OP above regarding Zeus going to Waterford.
As far as I know, its when it takes off big time (which it will). Waterford will have the extra floor space required for the large Zeus production lines that Rochester simply wont have at its disposal.
Its a back up plan if the Biotrue products dont take off as hoped